Round Duct System Fabrication, Installation & Insulation

Lucas County Corrections Center - Toledo, Ohio

IPS_Sheetmetal Instal_LCCC2

One Accountable Source, Shop to Jacket
IPS partnered with a large, regional contracting company to self-perform the complete ductwork and insulation scope at the Lucas County Corrections Center in downtown Toledo, Ohio. The work stayed inside two IPS divisions, Sheet Metal and Insulation, from the first shop drawing to final jacketing. That gave the partnering contractor one accountable source for fabrication, installation, and finish.

Sheet Metal: Fabricated and Installed to SMACNA Standards
IPS fabricated the round ductwork and installed it with AccuFlange connections. Crews sealed every joint to meet the specified leakage classification. They used Dura-Block supports where applicable and set hangers and reinforcements per SMACNA standards and project requirements. The same crews also fabricated and installed handrails on the crossover platforms that serve the new duct runs, so the team that built the systems also built the access structures.

Insulation: Built for Long-Term Thermal Performance
After the sheet metal crews finished, IPS installed a single 2″ layer of closed-cell polyisocyanurate. This is a rigid product chosen for its high thermal resistance and low water absorption, and it is rated for service from -50°F to 250°F. Crews finished the system in .020 smooth aluminum jacketing that was mechanically fastened, banded, and properly overlapped. Because the insulation is closed-cell, it resists moisture rather than absorbing it, which protects long-term performance in a building that has to run without interruption.

Working Inside an Active Secure Facility
The Corrections Center operated as an active, secure facility throughout the project. Facility security protocol, not construction convenience, governed every shift. IPS planned the sequence around those constraints:

  • Fabrication happened in advance at IPS’s 100,000 SF Rossford shop, which cut time spent inside the facility.
  • Sheet metal and insulation were coordinated internally, so both trades moved through controlled space as one crew.

The full scope was delivered in roughly three months.