Industry News

<div style="background-color: none transparent;"><a href="http://www.rsspump.com/?web_widget/rss_ticker/news_widget" title="News Widget">News Widget</a></div>
<div style="background-color: none transparent;"><a href="http://www.rsspump.com/?web_widget/rss_ticker/news_widget" title="News Widget">News Widget</a></div>
<div style="background-color: none transparent;"><a href="http://www.rsspump.com/?web_widget/rss_ticker/news_widget" title="News Widget">News Widget</a></div>
<div style="background-color: none transparent;"><a href="http://www.rsspump.com/?web_widget/rss_ticker/news_widget" title="News Widget">News Widget</a></div>
<div style="background-color: none transparent;"><a href="http://www.rsspump.com/?web_widget/rss_ticker/news_widget" title="News Widget">News Widget</a></div>
<div style="background-color: none transparent;"><a href="http://www.rsspump.com/?web_widget/rss_ticker/news_widget" title="News Widget">News Widget</a></div>

 
Engineer, Procure, Construct, Maintain, Fabricate - Power

(Click on a heading for a downloadable PDF with more details)

Energy Developments

IPS has been contracted by EDI to perform procurement and installation services for the landfill gas treatment
project at EDI’s Carbon Limestone power station.

Energy Developments

IPS was selected by EDI to perform the engineering, procurement and construction for the power station expansion project at EDI’s Lorain County Landfill.

POET Biorefining

IPS was responsible for the carbon steel and stainless steel utility and production piping. POET acted as the General Contractor and IPS self-performed all piping work.

The Dayton Power & Light, Co.

IPS fabricated large bore piping for the Dayton Power and Light tank farm which serviced the JM Stuart 2,400 megawatt power plant in Aberdeen, Ohio. IPS fabricated and installed 24”, 16” and 10” Schedule stainless pipe.

Troy Energy Peaking Plant

IPS was the General Contractor for a new electrical generator single cycle peaking plant in Luckey, Ohio. This project included the installation of (4) GE Frame 7 Turbine Generators. IPS was responsible for laying concrete foundations, installing underground piping and electrical systems, BOP piping, BOP electrical, inlet exhaust duct system, fire protection systems, installed all Centerline equipment, Centerline piping and electrical, Centerline fire suppression system, instrumentation, high voltage duct, calibration, operation and maintenance building.